- Home
- Vacatures
- Vacatures Arnhem
- Vacaturedetails
Chemisch Analisten (regio Utrecht, Gelderland en Overijssel)

Vacature doormailen
Business Analyst -Thinkproject Arnhem • Masters in Public
- Notitie toevoegen
- Vacature verbergen
- Vacature rapporteren
Gevraagd
-
32 - 40 uur
-
Medior/Senior
Aanbod
-
Vast contract
Vacature in het kort
Over het bedrijf
Volledige vacaturetekst
Europe’s energy transition is among the greatest challenges of our time. Its goal: To make Europe the first climate-neutral continent by 2050 at the latest. The Netherlands and Germany have therefore set themselves ambitious goals to expand offshore wind energy: as early as 2030, Germany and the Netherlands want to reach a capacity of 30 and 22.2 Gigawatts, respectively. Energy from offshore wind farms in the European powerhouse North Sea will play in this a crucial role. TenneT guarantees that this energy will reach the mainland – and in the most environmentally friendly way possible. That is why we have developed the 2GW program with a unique transnational approach. And thus increase the pace and efficiency of the energy transition.
Unit Large Projects Offshore NL (LON):
Based on the Energy agreement, where the targets and intentions for the transition to a more renewable energy supply are set, the Roadmap Offshore wind energy 2030 and the ambition to realise additional windcapacity prior to 2030 a roll-out strategy is being prepared for the medium term, including the IJmuiden Ver (DC) projects. This results in a commitment for TenneT to realise at least 2x (with potential up to 5) 2GW HVDC Grid Connection Systems which bring the power from offshore wind-farms in the North sea to the Dutch electricity grid to be commissioned between 2028 – 2030.
The 2GW program:
Europe’s energy transition is among the greatest challenges of our time. Its goal: To make Europe the first climate-neutral continent by 2050 at the latest. The Netherlands and Germany have therefore set themselves ambitious goals to expand offshore wind energy: as early as 2030, Germany and the Netherlands want to reach a capacity of 30 and 22.2 Gigawatts, respectively. Energy from offshore wind farms in the European powerhouse North Sea will play in this a crucial role. TenneT guarantees that this energy will reach the mainland – and in the most environmentally friendly way possible. That is why we have developed the 2GW program with a unique transnational approach. And thus increase the pace and efficiency of the energy transition.
Between 2028 and 2031, TenneT will realize the following 525 kV bipolar connections of high-voltage direct current (HVDC) with a capacity of 2 GW each in designated wind areas in the Dutch and German North Sea. These projects are part of the 2GW Program.
De eisen
Gerelateerde zoekopdrachten
Analist ArnhemParttime ArnhemVast contract ArnhemArnhemProvincie GelderlandAnalistSalaris AnalistVanaf nu ontvang je automatisch de best passende vacatures automatisch in je mailbox.
Jouw inschrijving
Emailadres:
Functie:
Plaats:
Frequentie:
Wijzig je inschrijving
Ontvang als eerste nieuwe vacatures voor Analist in Arnhem
Vind nieuw personeel op Werkzoeken.nl